EMERGENCY CORRIDOR SAVES LIVES!

On the two-lane roads the emergency corridor is formed by moving the vehicles in the right lane as far as possible to the right and the vehicles in the left lane as far as possible to the left. On three-lane roads, the middle lane is cleared by moving the vehicles in the middle lane as far as possible to the right and by providing access to emergency vehicles.

more info...

Advice for driving on a motorway

|

During summer months, motorway traffic is extremely dense and occasionally there is congestion due to high traffic demand. We appeal to the users due to their safety and safety of other traffic participants to show a high level of responsibility while driving, because, unfortunately, in the last few days, we have witnessed several serious traffic accidents with fatalities.

more info...
ETC packages can be purchased at all Toll Plazas 24/7.
phone info line
+385 1 6504 899

CROCODILE 3 CROATIA

 cro3 
   
Name of the project: CROCODILE 3 CROATIA
   
Project number:

2016-HR-TMC-0162-W

   
Project coordinator: Hrvatske autoceste d.o.o., Zagreb
   
Project partners:
  • Hrvatske autoceste d.o.o., Zagreb
  • Autocesta Rijeka-Zagreb d.d., Zagreb
  • Hrvatske ceste d.o.o., Zagreb
  • Bina-Istra d.d., Zagreb
  • Autocesta Zagreb-Macelj d.o.o., Zagreb
   
Project objective:

CROCODILE 3 CROATIA is a follow up of the CROCODILE 2 CROATIA project (www.crocodile2croatia.eu) and is a part of the CROCODILE 3 corridor that includes six member states (Austria, Czechia, Croatia, Hungary, Italy and Slovenia). CROCODILE 3 project directly contributes to the implementation of EU Directive 2010/40/EU on the framework for the deployment of Intelligent Transport Systems in the field of road transport and for interfaces with other modes of transport and supplements – Delegated Regulation (EU) No 885/2013 and Delegated Regulation (EU) No 886/2013.

The main focus of CROCODILE 3 CROATIA project is aimed at the implementation continuation of DATEX II standard for the traffic information amendment significant for traffic safety. The project will enable improvement and harmonization of DATEX II standard by upgrading systems in centers for management and traffic control Bosiljevo, Delnice and Čavle in order to improve the quality of information and data to be delivered to national access point.

An upgrade of existing plans and procedures for traffic management and installation of new equipment (info displays, video cameras and weather stations) will be conducted.

   
 Justification: The CROCODILE 3 CROATIA project will provide information services to users along the corridor where the planned services will be implemented. Before or during their trip, the help to optimize their route, react to disruptions in traffic and avoid potentially dangerous situations will be provided.
   
Project implementation period: 1 January 2018 - 31 December 2020
   

Project value:

EUR 4,896,000.00
   
The value of co-financing from the EU: EUR 4,161,600.00 (85%)
   
Co-financing: The project is co-funded by the European Union through the CEF programme.
   

Contact person for additional information:

Tatjana Matković

Phone number: +385 1 65 15 353

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

   
Useful links: http://crocodile3.crocodile2croatia.eu/
https://ec.europa.eu/inea/en/connecting-europe-facility
https://crocodile.its-platform.eu/
   

 

Project number

Traffic On Motorway

 ON DATE 22.08.2019 at 19:05

A1
Zagreb/Lučko - jctn. Karlovac
  • Regularly, dry roadway
A1
jctn. Karlovac - jctn. Bosiljevo 2
  • Regularly, dry roadway
A6
jctn. Bosiljevo 2 - jctn. Kikovica
  • Regularly, dry roadway
A6
jctn. Kikovica - Rijeka/jctn. Orehovica
  • Regularly, dry roadway
A7
jctn. Orehovica - jctn. Diračje
  • Regularly, dry roadway
A7
GP Rupa - jctn. Diračje
  • Regularly, dry roadway
D102
Krk Bridge
  • Regularly, dry roadway
 

Traffic in Croatia

ON DATE 22.08.2019 at 19:52

more info...